by Jane Willacey

We were instructed at the end of April 2021 by Mrs O from South London who had been experiencing ongoing leaks, damp and mould within the leasehold flat she had shared with her husband and three children since 2019. We took her case on under a ’No Win No Fee’ agreement.

Our client and her family moved into their first floor flat in 2012 and in 2014 they purchased the leasehold. In early 2019 wet patches and mould started to appear on the walls and window frames in both the kitchen and the living room and soon after it quickly spread to the flooring and throughout other rooms. Our client checked with their downstairs neighbour who confirmed she was experiencing the same issues and together they looked over the exterior walls finding that two walls on one side of the building were very wet and covered with algae.

 Our client tried multiple times to contact the council who owned the freehold of the building but she didn’t get a reply. Our client continuously called and emailed the freeholder over the next few months to no avail.

By the summer of 2019 the disrepair was getting progressively worse, our client was spending both time and money washing down and repainting walls, cleaning carpets and replacing soft furnishings that had become saturated with damp and mould. It was at this point that the freeholder sent a contractor to the property who cosmetically covered up the damage by painting over the offending mould on the walls and window frames however no repairs and no investigations into the root cause of the disrepair took place.

At the start of 2020 a particularly long spell of heavy rain caused a major leak in the bedroom, water had poured through the light fitting resulting in the electrics shorting out. Our client was living with no electricity supply to this room but the resulting emails and calls to the freeholder again were ignored.

By the early spring of 2021 our client and her family had lived in a state of disrepair for over two years which had really taken its toll and had a detrimental impact on the family. It was at this point that our client felt that they could no longer live in their property whilst it was in such a severe state of disrepair, their physical and mental health had been severely affected and to provide a better home for herself, her husband and their children they took the decision to rent a property paying a reduced rent through their church until the disrepair was rectified. Our client was now effectively paying for two properties putting a heavy strain on their financial situation.

The freeholder made no attempt over two years to adequately investigate or attempt to repair the external damage which was the root cause of the internal disrepair therefore once we took instruction we gathered evidence of the correspondence between our clients and the freeholder plus copies of the original lease and appointed an expert surveyor to assess the property and report his findings.

The surveyor reported that some of the main issues were an active leak from a soil pipe causing penetrating damp and mould in the kitchen and bathroom and an active leak coming from the above property, which resulted in numerous problems such as black mould, damp, moss growth, rotten panelling, spalled plaster, lifted flooring and warped doors and frames.

We sent a detailed letter of claim to the freeholder setting out that they were in breach of express and implied terms of tenancy and/or breach of their statutory and common law duties by not adhering to the clauses outlined in the leasehold regarding the freeholders responsibility for the maintenance and repairs of all common area water and waste pipes.

The other party’s solicitor acknowledged our letter of claim but didn’t contact us with a reply, however after chasing them for some weeks they did eventually instruct their own nominated surveyor to assess the property. The freeholder’s expert surveyors report agreed with ours therefore we made a settlement offer.

Our offer was rejected and liability was denied with the freeholder stating that our client “should claim on their insurance”. We argued that even if our client was able to claim on her insurance for damages the leaks would first need to be stopped and this was the freeholder’s obligation under the express and implied terms of tenancy.

All of our subsequent offers were rejected and the council continued to deny liability therefore we issued court proceedings. As the date of the court case grew closer the freeholders’ solicitors contacted us to let us know that they would now welcome an offer of settlement, we made an offer based on the monthly rent valuation of their property, the amount of time that had passed, the effect on the families physical and mental health and their excess outgoings for rent on their temporary property. Our offer was again rejected by the freeholder with their counteroffer being well below par and in turn rejected by us.

Fast forward to just two days before the trial date, the freeholders solicitors came back to us with a part 36 offer to settle out of court of £25,600 to cover damages and repairs with all their legal fees recovered from the other side. After discussing this offer with our client she accepted.

Our client’s had up until the point of instruction lived in a state of disrepair for over two years and whilst getting their home repaired and returned to a liveable state was of primary importance the compensation that they received helped immensely with getting their lives back on track.

For more information on how compensation is generally calculated, read our article on this subject: https://www.mjvlaw.co.uk/legal-news/housing-disrepair-compensation/

by Jane Willacey

We were instructed in November 2020 by Mr and Mrs Z from South London who had been experiencing substantial and ongoing disrepair since they moved into their leasehold property in the spring of 2012. . Having spent nearly eight years trying and failing to get the freeholder to repair exterior damage to the property which was causing internal disrepair they contacted us and we took on their case under a ‘No Win No Fee’ agreement.

Soon after moving into their ground floor flat our clients became aware of excess humidity in the bathroom which was causing condensation to run down the walls resulting in puddles on the floor. Our clients reported this to the freeholder who sent one of their contractors to inspect. Our clients were informed by the contractor that this is only condensation and there is nothing that can be done.

In the early winter of the same year our clients noticed that black mould was beginning to form on the walls of the bathroom. Our clients reported this again to the freeholder who informed our clients that this would be the clients responsibility. The freeholder refused to take any action to inspect the property.

By the middle of 2013 the disrepair was getting much worse. The excess moisture was affecting the metal fixtures of the bathroom which began to rust and the exterior wall of the bathroom was wet to the touch after rainfall, the black mould was also spreading and becoming thicker than it had been the previous year. Furthermore, the mould and damp started to appear in all of the other rooms of the property causing extensive damage to carpets, laminate flooring, walls and soft furnishings.  Again, this was reported to the freeholder and an inspection took place, this time it was identified that part of the problem was likely to be that the soil outside the property was too high and situated far above the damp proof course causing excess moisture inside. However, despite the initial investigation the freeholder made no attempt to rectify the issue.

Towards the end of 2013, our clients noticed water leaking from the light fixture in their master bedroom. This was reported to the freeholder and the leak was stopped and ceiling painted. However, mildew started to grow on the ceiling of the master bedroom suggesting that the damage caused by the leak had not been properly rectified and instead just cosmetically covered up.

In the spring of 2014, our clients sent the freeholder a letter setting out all the complaints and repair requests that they had previously made to them over the two years of living at the property. The freeholder responded to this letter by telling our clients to use a better quality of paint and to paint over the areas where the black mould is showing through.

The disrepair carried on for a further six years with conditions gradually getting worse each year. Our clients were fighting a losing battle with the freeholder and as well as living in an unsafe environment they were spending hundreds each year having to replace flooring and soft furnishings that become saturated with damp and mould, this was having a detrimental effect on both our clients physical and mental health.

The freeholder had made absolutely no attempt to repair the damage and/or adequately investigate the root cause of the disrepair over the 8 years the clients had lived at the property, therefore we gathered all evidence of correspondence between our clients and the freeholder plus copies of the original lease and instructed a reputable surveyor to assess the property who reported that the level of disrepair was indeed substantial.

We also instructed a structural engineer who cited negligent building construction including but not limited to cold bridges, cracks and access holes in the exterior walls, soil above the damp proof course and ineffectual guttering and wastewater management all of which contributed to the very high levels of humidity, condensation and black mould. The experts concluded that the extent of the black mould and absence of proper ventilation was an urgent health hazard.

We sent a detailed letter of claim to the freeholder setting out that they were in breach of clauses of the lease and/or breach of their statutory and common law duties. The Freeholder denied liability stating that they were only responsible for the exterior of the property and not responsible for the clients’ interior disrepair which may have been true had the interior disrepair not been caused by exterior negligence.

The freeholder continued to deny liability even after appointing their own expert surveyor to assess the property, their surveyors report agreed on all counts with our experts report therefore we issued court proceedings. The freeholder at this point accepted that they need to take this seriously and entered negotiations with us. After numerous below par offers from the freeholder our client accepted a part 36 offer of £10,000 in damages with all repairs to be completed within 120 days plus all their legal costs recovered by the other side.

Our client’s had up until the point of instruction lived in a extreme state of disrepair for a total 8 years and whilst the most important thing for our client’s physical and mental health was getting their home repaired and them back to a good standard of living, the compensation payout that they received for all the distress and health implications caused came a close second.

For more information on how compensation is generally calculated, read our article on this subject: https://www.mjvlaw.co.uk/legal-news/housing-disrepair-compensation/

by Jane Willacey

We were instructed by Mr B from The Midlands in the summer of 2021, he had been experiencing substantial disrepair issues within his council property since 2017.  Our client had tried and failed on numerous occasions to get the council to sufficiently repair his home therefore he contacted us and we took on his case under a ‘No Win No Fee’ agreement to claim compensation and get his home repaired.

Rotten wooden window frames and blown seals were causing draughts, leaks, condensation, and black mould. Numerous calls and emails from our client to the council had resulted in the window frames being glossed over rather than being adequately repaired or replaced and whilst this caused our client great distress and inconvenience this was not the worst of the disrepair. A leak above the living room had been slowly making itself known and after numerous calls and emails to the council no less than three contractors attended the property for it to be reported on each occasion that they were “unable to find the cause of the leak” and “it’s just a slow drip” but of course a slow drip over time will eventually lead to a much bigger problem in the future and it eventually resulted in the living room ceiling collapsing.

The councils attempts to fix the clients property were few and far between and less than satisfactory which left our client with the stress and physical health implications of living in a constant state of disrepair.

Evidence of numerous phone calls, emails and letters to the council were supplied by the client along with a report from a reputable surveyor that confirmed that the level of disrepair within our client’s property was substantial.

We sent a detailed letter of claim to the council setting out that they were in breach of express and implied terms of tenancy and/or breach of their statutory and common law duties however they refused to accept liability or agree to do the repairs within a satisfactory time frame therefore we issued court proceedings.

The court ruled that the council was in breach of the terms of tenancy and the client was awarded compensation of £8,000 with all legal costs recovered from the other side. The living room ceiling was fixed and finished to a high standard with new windows fitted throughout within just a few weeks.

Our client had up until the point of instruction lived in a state of disrepair for a total of 1624 days and whilst the most important thing for the client’s health and well being was getting his home repaired the compensation for all the distress caused came a close second.

For more information on how compensation is generally calculated, read our article on this subject: https://www.mjvlaw.co.uk/legal-news/housing-disrepair-compensation/